blog:2019-08-16:rc_fire_hall
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
blog:2019-08-16:rc_fire_hall [2019/08/16 17:21] – ve7hzf | blog:2019-08-16:rc_fire_hall [2020/08/07 13:03] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 3: | Line 3: | ||
{{ : | {{ : | ||
- | The next phase will be to run power from the comm's closet out to the top, install a grounded bus bar with a coax lightening protector, and move the repeater. | + | Many thanks to [[https:// |
+ | |||
+ | The next phase will be to run power from the comm's closet out to the top, install a grounded bus bar with a coax lightening protector, and move the repeater. Until then, the repeater is still operational on 442.650 MHz + T100. |
blog/2019-08-16/rc_fire_hall.txt · Last modified: 2020/08/07 13:03 by 127.0.0.1