User Tools

Site Tools


blog:2020-09-13:new_desk

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
blog:2020-09-13:new_desk [2020/09/13 13:06] va7fiblog:2020-09-13:new_desk [2020/09/14 09:05] (current) va7fi
Line 1: Line 1:
-====== New Desk ======+====== VA7FI'New Desk ======
  
-Yesterday, I finally finished re-organizing the bulk of my station.  Here are a few before / after pictures.+Yesterday, I finally finished installing my new desk and re-organizing the bulk of my station.  Here are a few before / after pictures.
  
 ===== Before ===== ===== Before =====
 <WRAP box> <WRAP box>
 {{ :blog:2020-09-13:open.jpg?250}} {{ :blog:2020-09-13:closed.jpg?164}} {{ :blog:2020-09-13:open.jpg?250}} {{ :blog:2020-09-13:closed.jpg?164}}
-Since we moved to Roberts Creek, my station has been in tucked away in a small Ikea shelving unit in the corner of our small livingroom.  It was nice because I could close the doors and keep everything hidden away, but it also means that it wasn't very comfortable to operate for extended periods. \\ \\ After much deliberation, we decided to replace the shelving unit with an adjustable sit / standup desk.+Since we moved to Roberts Creek, my station has been tucked away in a small Ikea shelving unit in the corner of our small livingroom.  It was nice because I could close the doors and keep everything hidden away, but it also means that it wasn't very comfortable to operate for extended periods. \\ \\ After much deliberation, we decided to replace the shelving unit with an adjustable sit / standup desk.
 </WRAP> </WRAP>
  
Line 16: Line 16:
 I took apart the old shelving unit and rebuilt it so part of it would sit on top of the desk, and part of it would be on the floor under the desk. I took apart the old shelving unit and rebuilt it so part of it would sit on top of the desk, and part of it would be on the floor under the desk.
  
-The cubby on the right was made to the fit my IC-7300, ID-5100, speakers, and microphones.  However it would be pretty trivial to shift the vertical piece somewhere else if needed.  I also didn't make it too high so that the monitor would be comfortable to use. +The cubby on the right was made to the fit my IC-7300, ID-5100, speakers, and microphones.  However it would be pretty trivial to shift the vertical piece somewhere else if needed.  I also reduced the height so that the monitor would be comfortable to use.
 </WRAP> </WRAP>
  
Line 31: Line 31:
   * On the first shelf (from left to right) is the Echolink Signalink and computer, an Ethernet switch, and my packet computer and Signalink.   * On the first shelf (from left to right) is the Echolink Signalink and computer, an Ethernet switch, and my packet computer and Signalink.
   * Mounted under the first shelf is the Echolink Kenwood radio, and the IC-207 for packet.  The nice thing about the IC-207 is that I've got all the channels programmed into it and it's just a matter of spinning the dial to use it as a voice radio.   * Mounted under the first shelf is the Echolink Kenwood radio, and the IC-207 for packet.  The nice thing about the IC-207 is that I've got all the channels programmed into it and it's just a matter of spinning the dial to use it as a voice radio.
-  * On the second shelf is the N8XJK super booster and my pre and post booster distribution blocks.  I also have two 5V DC-DC converters in parallel to feed the computers and the switch on the first shelf.  My goal is to eventually convert all of this to powerpoles, but that's a project for another time.+  * On the second shelf is the N8XJK super booster and my pre and post booster distribution blocks.  I also have two 12VDC -> 5VDC converters in parallel to feed the computers and the switch on the first shelf.  My goal is to eventually convert all of this to powerpoles, but that's a project for another time.
   * On the bottom shelf is the power supply and a small battery pack that complements the bigger battery bank in the container.   * On the bottom shelf is the power supply and a small battery pack that complements the bigger battery bank in the container.
 </WRAP> </WRAP>
Line 38: Line 38:
 {{ :blog:2020-09-13:behind.jpg?400}}A very nice bonus is to be able to easily slide everything out a few feet to work on the wiring behind. {{ :blog:2020-09-13:behind.jpg?400}}A very nice bonus is to be able to easily slide everything out a few feet to work on the wiring behind.
 </WRAP> </WRAP>
 +
 +
 +===== Still To Do =====
 +  * Finish the grounding.
 +  * Re-run the DC wiring from the crawlspace to behind the station.
 +  * Move all the solar panels on top of the container.
 +
blog/2020-09-13/new_desk.1600027589.txt.gz · Last modified: 2020/09/13 13:06 by va7fi