User Tools

Site Tools


blog:2019-07-06:island_trunk_system_-_newcastle_ridge_building_replacement_appeal

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
blog:2019-07-06:island_trunk_system_-_newcastle_ridge_building_replacement_appeal [2020/08/07 13:03] – external edit 127.0.0.1blog:2019-07-06:island_trunk_system_-_newcastle_ridge_building_replacement_appeal [2021/06/05 12:47] (current) va7fi
Line 9: Line 9:
 <fc #ff0000>Here's an update from Chris (Sept 23, 2019)</fc> <fc #ff0000>Here's an update from Chris (Sept 23, 2019)</fc>
  
-> Please relay our thanks to your club for the donation.  We have made very good progress in raising the necessary funds and we are working at finalizing the details for the building replacement.  Our current plan is to acquire an 8x8 C-can as the replacement for the building as this will be the most resilient alternative for the harsh environment. We anticipate getting this in place by next late spring which give us enough time arrange the purchase, transport and modification as a repeater building.  We will still be looking to raise additional funds to ensure all the necessary materials can be purchased.  As we get closer to the time we will be arranging work parties to get the unit modified and then for the work when we do the actual replacement. +<QUOTE>Please relay our thanks to your club for the donation.  We have made very good progress in raising the necessary funds and we are working at finalizing the details for the building replacement.  Our current plan is to acquire an 8x8 C-can as the replacement for the building as this will be the most resilient alternative for the harsh environment. We anticipate getting this in place by next late spring which give us enough time arrange the purchase, transport and modification as a repeater building.  We will still be looking to raise additional funds to ensure all the necessary materials can be purchased.  As we get closer to the time we will be arranging work parties to get the unit modified and then for the work when we do the actual replacement. 
-> + 
->cheers +cheers 
->Chris +Chris 
->ve7top+ve7top</QUOTE>
  
  
blog/2019-07-06/island_trunk_system_-_newcastle_ridge_building_replacement_appeal.txt · Last modified: 2021/06/05 12:47 by va7fi