blog:2020-09-13:new_desk
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
blog:2020-09-13:new_desk [2020/09/13 13:08] – va7fi | blog:2020-09-13:new_desk [2020/09/14 09:05] (current) – va7fi | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== New Desk ====== | + | ====== |
- | Yesterday, I finally finished re-organizing the bulk of my station. | + | Yesterday, I finally finished |
===== Before ===== | ===== Before ===== | ||
<WRAP box> | <WRAP box> | ||
{{ : | {{ : | ||
- | Since we moved to Roberts Creek, my station has been in tucked away in a small Ikea shelving unit in the corner of our small livingroom. | + | Since we moved to Roberts Creek, my station has been tucked away in a small Ikea shelving unit in the corner of our small livingroom. |
</ | </ | ||
Line 16: | Line 16: | ||
I took apart the old shelving unit and rebuilt it so part of it would sit on top of the desk, and part of it would be on the floor under the desk. | I took apart the old shelving unit and rebuilt it so part of it would sit on top of the desk, and part of it would be on the floor under the desk. | ||
- | The cubby on the right was made to the fit my IC-7300, ID-5100, speakers, and microphones. | + | The cubby on the right was made to the fit my IC-7300, ID-5100, speakers, and microphones. |
</ | </ | ||
Line 38: | Line 38: | ||
{{ : | {{ : | ||
</ | </ | ||
+ | |||
+ | |||
+ | ===== Still To Do ===== | ||
+ | * Finish the grounding. | ||
+ | * Re-run the DC wiring from the crawlspace to behind the station. | ||
+ | * Move all the solar panels on top of the container. | ||
+ |
blog/2020-09-13/new_desk.txt · Last modified: 2020/09/14 09:05 by va7fi