-====== VE7SCK Update ======+====== VE7SCK Update ======
  
 There's a lot going on with VE7SCK at the moment and we'll use this post to keep you up-to-date.  First of all, recall that: There's a lot going on with VE7SCK at the moment and we'll use this post to keep you up-to-date.  First of all, recall that:
-  * Last year, we installed the VE7SCK at the [[/blog/2019-08-16/rc_fire_hall |Fire Hall in Roberts Creek]].  Because the antenna is so low, the coverage is very minimal, but we simply wanted to get a foot in the door for when the new tower is installed.+  * Over a year ago, we installed the VE7SCK at the [[/blog/2019-08-16/rc_fire_hall |Fire Hall in Roberts Creek]].  The antenna was very low so the coverage was very minimal.  But it helped us get a foot in the door for when the new tower is installed.
   * A few weeks later, we [[blog/2019-08-01/ve7sck_update |changed to tone]] to match VE7RXZ and updated the coordination information.   * A few weeks later, we [[blog/2019-08-01/ve7sck_update |changed to tone]] to match VE7RXZ and updated the coordination information.
   * Here are [[/photos/2010-2019#ve7sck_442650_install_photos_-_sept_6_2019 |some pictures]] of the current install.   * Here are [[/photos/2010-2019#ve7sck_442650_install_photos_-_sept_6_2019 |some pictures]] of the current install.
  
-<fc #ff0000>Update from Nov 21:</fc> +<fc #ff0000>Update from June 24, 2021:</fc> 
-  * Recently, the new <ff sans-serif>TELUS</ff> [[https://www.coastreporter.net/news/local-news/scrd-directors-support-telus-tower-in-roberts-creek-1.24168527|tower was approved]]and +  * Today Don from [[http://www.island-communications.com/#intro |Island Communications]] was over to switch the firehall equipment over to the new tower and he terminated our coax and added a polyphaser. 
-  * We started working with the engineer to submit a proposal to <ff sans-serif>TELUS</ff> to have our antenna moved to the up-coming tower+  * I also brought LMR-400 cable and N-connectors and Don made patchcords for us to replace the old repeater patch cords
-  * Today, our club approved the purchase of a [[https://comprodcom.com/shop/antennas-clamps/exposed-dipole-antennas/uhf-exposed-dipole-774-70/ |Comprod 4-bay colinear folded dipole]] antenna (contingent on <ff sans-serif>TELUS</ff> approval), and the immediate purchase of equipment to link VE7SCK to VE7RXZ+  * The repeater is now fully operational and we encourage people to try it so we can get a sense of its coverage (specially if you're mobile on the highway). 
-  * Members can look at the full details in the [[/memberscorner/minutes/2020-2021#nov_21_2020 |minutes]].+  * The next step is to link it to the VE7RXZ in Nanaimo.
  
-<fc #ff0000>Update from Nov 27:</fc> +<fc #ff0000>Update from April 18, 2021:</fc> 
-  * Good news!  <ff sans-serif>TELUS</ff> has approved the antennas on the tower.  The plan changed little bit (for the better) and it'to have the UHF repeater antenna at 35m (115ft) and VHF yagi at 25m (82ft)+  * Our antennas are up and the coax is run to the radio room, but not terminated.  Don from Island Communications will come over in month or so to do the connection.  We can't do it ourselves because it'LMR600
-  * No news yet on when this will all happen+<WRAP third column> 
-  * In the meantime, Robert and Patrick will start working on linking VE7SCK to VE7RXZ (which we can do with the existing setup).+{{  img_20210423_162114.png  }} 
 +</WRAP> 
 +<WRAP third column> 
 +{{  img_20210413_155125.png  }} 
 +</WRAP> 
 +<WRAP third column> 
 +{{  img_20210413_155135.png  }} 
 +</WRAP>
  
-<fc #ff0000>Update from Jan 3:</fc> +<fc #ff0000>Update from Mar 25, 2021:</fc> 
-  * I haven't heard any official news but it looks like they're starting to clear up the area around the existing tower+  * Looks like they started installing Firehall antennas.  There's two VHF antennas and one 800MHz :?: Yagi. 
-{{  20210103_154252.jpg  }}+  * Ours are not up yet
 +{{  2021-03-25-074226.jpeg  }} 
  
-<fc #ff0000>Update from Jan 31:</fc> +<fc #ff0000>Update from Mar 05, 2021:</fc> 
-  * Looks like they've poured the concrete foundation for the new tower+  * Tower is up! 
-{{  20210131_231513844.jpg  }}+{{  img_20210302_132655.jpg  }} 
 +{{  20210305_144313.jpg  }}
  
-<fc #ff0000>Update from Feb 09:</fc>+<fc #ff0000>Update from Feb 09, 2021:</fc>
   * Looks like the Telus radio room is on the foundation.   * Looks like the Telus radio room is on the foundation.
 {{  telusroom.jpg  }} {{  telusroom.jpg  }}
  
-<fc #ff0000>Update from Mar 05:</fc> +<fc #ff0000>Update from Jan 31, 2021:</fc> 
-  * Tower is up! +  * Looks like they've poured the concrete foundation for the new tower
-{{  img_20210302_132655.jpg  }} +{{  20210131_231513844.jpg  }}
-{{  20210305_144313.jpg  }}+
  
-<fc #ff0000>Update from Mar 25:</fc> +<fc #ff0000>Update from Jan 3, 2021:</fc> 
-  * Looks like they started installing Firehall antennas.  There's two VHF antennas and one 800MHz :?: Yagi. +  * I haven't heard any official news but it looks like they're starting to clear up the area around the existing tower
-  * Ours are not up yet+{{  20210103_154252.jpg  }}
-{{  2021-03-25-074226.jpeg  }} +
  
-<fc #ff0000>Update from April 18:</fc> +<fc #ff0000>Update from Nov 27, 2020:</fc> 
-  * Our antennas are up and the coax is run to the radio room, but not terminated.  Don from Island Communications will come over in month or so to do the connection.  We can'do it ourselves because it's LMR600.+  * Good news!  <ff sans-serif>TELUS</ff> has approved the antennas on the tower.  The plan changed little bit (for the better) and it'to have the UHF repeater antenna at 35m (115ft) and VHF yagi at 25m (82ft). 
 +  * No news yet on when this will all happen. 
 +  * In the meantime, Robert and Patrick will start working on linking VE7SCK to VE7RXZ (which we can do with the existing setup).
  
 +<fc #ff0000>Update from Nov 21, 2020:</fc>
 +  * Recently, the new <ff sans-serif>TELUS</ff> [[https://www.coastreporter.net/news/local-news/scrd-directors-support-telus-tower-in-roberts-creek-1.24168527|tower was approved]], and
 +  * We started working with the engineer to submit a proposal to <ff sans-serif>TELUS</ff> to have our antenna moved to the up-coming tower.
 +  * Today, our club approved the purchase of a [[https://comprodcom.com/shop/antennas-clamps/exposed-dipole-antennas/uhf-exposed-dipole-774-70/ |Comprod 4-bay colinear folded dipole]] antenna (contingent on <ff sans-serif>TELUS</ff> approval), and the immediate purchase of equipment to link VE7SCK to VE7RXZ.
 +  * Members can look at the full details in the [[/memberscorner/minutes/2020-2021#nov_21_2020 |minutes]].
  
blog/2020-11-21/ve7sck_update.1618765962.txt.gz · Last modified: 2021/04/18 10:12 by va7fi